Lpg Gas Pipe Line Installation For Hotel

Lpg Gas Pipe Line Installation For Hotel
Lpg Gas Pipe Line Installation For Hotel

Lpg Gas Pipe Line Installation For Hotel Specification

  • Installation Time
  • Depends on site (Typically 1-5 days)
  • Installation Type
  • On Site
  • Design Standard
  • IS:6044/IS:1239 (or as customer specification)
  • Pipe Size
  • 1/2 inch, 3/4 inch, 1 inch, Custom sizes available
  • Fitting Accessories
  • Regulators, Valves, Manifold, Connectors included
  • Surface Finishing
  • Paint Coated/Galvanized (as per client choice)
  • Usage
  • Commercial Kitchen Gas Distribution
  • Safety Features
  • Integrated Gas Leak Detectors, Emergency Shut Off Valves
  • Application
  • Hotel Kitchen Gas Supply
  • Corrosion Resistance
  • Yes
  • Service Mode
  • Onsite Installation Service
  • Length Per Pipeline Section
  • Custom as per layout/site
  • Material
  • Mild Steel / Copper (as per site requirement)
  • Jointing Method
  • Brazed/Screwed/Flanged as per requirement
  • Maintenance Service
  • Periodic Inspection & AMC Available
  • Product Name
  • LPG Gas Pipe Line Installation For Hotel
  • Working Pressure
  • Up to 2 Bar (as per design)
 
 
Tell us about your requirement
product

Price:  

Quantity
Select Unit

  • 50
  • 100
  • 200
  • 250
  • 500
  • 1000+
Additional detail
Mobile number

Email

More Products in Installation Service Category



Back to top